PortBUG: Improvements on the Outer Harbor Greenway.


Belmore Terrace, Woodville Park, site of proposed improvements to the Outer Harbor Greenway.

The PortBUG was recently involved in discussions with Charles Sturt Council – along with WestsideBUG and BISA – about proposed changes to the Outer Harbor Greenway path at the junction of Belmore and David Terraces, Woodville Park.

Greenway crossing, David Trc (top right) with the current abrupt transition onto Belmore Trc.

PortBUG has long been a critic of this section of the Greenway pointing out the awkward and (we thought) hazardous location of the pathway entrance/exit close to a ‘high-speed’ corner and the narrow and abrupt transition between road and path.

In the words of CCS engineer Chris Bentick, “the existing shared path link at the intersection (pictured below) is relatively short and directs Port-bound cyclists into the intersection, bringing them into conflict with drivers turning right and left into Belmore Terrace from David Terrace.”

The City of Charles Sturt have now come up with a plan to reduce any hazards involved by:

  • extending the pathway & shifting the ramp several metres to the west (making use of an existing car parking bay)
  • widening the ramp & improving its design to reduce heights & create more gradual transitions
  • improve sight lines & capacity to monitor traffic.

Proposed new pathway (plan provided courtesy of CCS).

There have obviously been a number of things to consider in managing bike /car interactions at this point. Chris says:

“A design solution has been proposed that involves extending the shared path/bicycle path segment further along Belmore Terrace to increase the separation between the turning areas for cyclists and motor vehicles… Design features of note:

  • Design maintains trees adjacent railway corridor.
  • Pedestrian access across Belmore Terrace retained.
  • ‘Bicycle only’ path northwest of pedestrian ramp crossing Belmore Terrace.
  • One parking space lost.
  • Relatively high entry angle for bicycles at access to Belmore Terrace for safe entry and exit speeds.

… Once design is finalised, we intend to construct in coordination with works at Belmore Terrace intersections in 2019/20.”

Detail of exit/entry point and ramp at Belmore Trc.

As Cris says:  “It really is a matter of striking the balance between safety and convenience. When we create conditions for fast and convenient entry and exit to the path, we also create conditions by which path users are less able and likely to adequately respond should there be conflict with motor vehicles in Belmore Terrace. We regard the ultimate design as maintaining that balance… We will be upgrading the lighting in the area next year, so lighting near the ramps will be significantly improved.”

In our view these are all important benefits for bike users and we congratulate the CCS staff involved for their thoughtful and committed approach to improving the Greenway experience for bicycle users. We believe that there are a many places along the Outer Harbor Greenway that will benefit from this 2nd phase of refinement as its use by the community grows and need for improvement become more obvious.

This entry was posted in Uncategorized. Bookmark the permalink.

1 Response to PortBUG: Improvements on the Outer Harbor Greenway.

  1. Uncool Cycling Club says:

    This is a small but important change. Well done to all concerned.

    Like

Leave a Reply to Uncool Cycling Club Cancel reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.